Thursday, June 26, 2008

Day 21: Tension in the office


26th June


Sat down and started to work on the Amin Rafie Project.

  • Look into Amin Rafie Project
  • Look into Kota Damansara Project
~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.

Amin Rafie Project

I started work on the designing of the pagola. Halfway through, I decided to re-modify the coping and the connection portion of the building that will connect the pre-existing building and the new building. I browsed through several references within the company's library for an inspiration. As soon as I started, Mr. Azhar gave me some of his design ideas for me to use.

Kota Damansara Project

Had to do some quick remodeling on the Kota Damansara Project for Mr. Azhar. He wanted a clean drawing plan for the relocation of the power supply. Not much work done on this task. I was swift and direct.

~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.

Today everything was pretty much routine for me. I can't say the same for my colleagues though. They were given unreasonable deadlines and everyone was pretty pissed off for a moment or two. But the usual jokes came about occasionally. At lunch, Amir was once again talking about the corruption in the industry; this time in detail and how pissed he was. Before I checked out of the office, my colleagues were still working on a project with the deadline due in less then 24 hours.

End of Day 21