18th July
As I walked into the office today, Mr. Azhar asked if I knew of any printing shop in the vicinity of his office. The spur of the question was prior to me showing him of Win’s Art.
- Look into Amin Rafie Project
- Look into Kota Damansara Project
~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.
Amin Rafie Project
Slight amendments to the 3D model by introducing a window to a walkway which I had missed out. I then had to print an image for certain angles which would be presented to the client.
Kota Damansara Project
I did not immediately start on the project instead I used up my time searching for the approved drawing and As-Built drawings. Mr. Azhar gave me brief instructions on the project.
Slight amendments to the 3D model by introducing a window to a walkway which I had missed out. I then had to print an image for certain angles which would be presented to the client.
Kota Damansara Project
I did not immediately start on the project instead I used up my time searching for the approved drawing and As-Built drawings. Mr. Azhar gave me brief instructions on the project.
~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.~.
I will only be working half day today. Time was short and the changes I did on the Amin Rafie Project were instantaneously. As for the Kota Damansara Project, I did not start as with the short amount of time I wouldn’t be able to complete much. So I spent my time drinking water, making coffee (for myself), starting up the printer which was acting weird and disturbing my colleagues. Hady found out I had used his account to randomly add friends while he was not away yesterday and using his account to hunt for potential female/ gay friends.
End of Day 36
No comments:
Post a Comment